Cost efficient Offshore Wind Turbine Lifting

We deliver extra lifting height to the jack-up-vessel owner by the protected Tetrahedron design. Design tailorization to customer needs can be performed smoothly by parametric engineering. Fabrication is performed by qualitative European subcontractors. Integration on a compact jackup vessel results in the most sustainable solution possible. Tetrahedron company stays with the customer by continuously maintaining and advancing the involved lifting equipment and crane control software. IP and engineering software ensure the sustainable competitive edge, but the people in the team are the ones that make it happen!

Tetrahedron, simply lifting high

With Wind Turbine Generators getting bigger and bigger, new challenges for the wind installation industry have emerged. One of them is to simply lift higher on a compact Jackup. The Tetrahedron, 50m lifting height upgrade, enables a market entry to lift nowadays 8-15MW turbines for the existing jackup-vessel owner. Tetrahedron is founded on the principle to lift higher.


Technology

Rotterdam-based Tetrahedron company patented, developed and achieved DNVGL design verification on the crane principle and concept design. The Tetrahedron crane is purposely engineered for efficient Wind Turbine Generator installation. Key attention is given to lifting height, capacity at height, lifting radius and jib-clearance. Due to this, a compact Tetrahedron crane model can be used to install today’s largest turbines.


Launching of Tetrahedron 8

Lifting capacity base reeving:

O&M Activities         160T at 30m radius (4 falls)

250T at 16m radius (6 falls)


Blade installation:    120T at 35m

                   Installation at 130m above deck


Fully electric driven


Speeds:

Main Hoist 160T Load (4 falls):            12 m/min

Main Hoist Empty Hook (4 falls):          30 m/min

Luffing time                                           10 min

    (full stroke)


This crane under construction is suitable for maintenance work. The Tetrahedron crane principle is obviously suitable for installation work and Tetrahedron would be pleased to design it for you.

Keen to learn more?

Of notable mention

“Tetrahedron is set to build a prototype crane with its consortium consisting of Jack-Up Barge BV, TNO, Shell and GE.”


Offshore-mag

“Crane solution means older vessels can be adapted to install next-generation offshore giants.”



Wind Power Monthly

“....NewWindShape, a dedicated feeder solution combining proven jack-up technology and award-winning crane design for the offshore wind industry.”

Offshore wind innovators

About us

Partners

 

 

Contact

  Tetrahedron B.V.

Chamber of commerce: 73016608

Visit us at the Heijplaat-RDM building at address:

Klinknagelstraat 2, 3089 JP


Rotterdam, the Netherlands


email:info@tetrahedron.tech


telephone:+31 102613038


LinkedIn:   Tetrahedron-cranes 

 

Share by: